The following process and tests are performed on the Display Boards before dispatching:

  1. Upload EEPROM CLEAR Hexfile and let the display initialize.

  2. Upload Bootloader Hexfile

  3. Upload Assigned Binfile from the Bootloader Server

  4. After successful Firmware Update, perform the following test with hardware setup:
    a. TRANSACTIONS
    b. CALIBRATION
    c. UNIT RATE CHANGE
    d. PRINTER TEST
    e. AUTOMATION TEST
    f. DATE AND TIME CHANGE
    g. CHECK AND VALIDATE LOGS
    h. CHECK SHA 256 IN ABOUT PAGE AND VALIDATE IT WITH THE BIN FILE SHA 256 ON THE SERVER

  5. After all the above successful test result, ENTER DISPLAY SERIAL NUMBER ONLY.
    KEEP DU SERIAL NUMBER AS IT IS (i.e. 99000000)